Development
Strengthening logistics functions is a major policy in the Nagoya Port Plan formulated by the port authority.
Below are the major port plans for the future at the Port of Nagoya.
(*Yellow areas in the map indicate planned construction sites listed below. Some of them are already
completed and in use)
Container Terminal
Tobishima Pier South Side Container Terminal
- Water depth
- 16.0m
- Berth length
- 1,200m (3 berths)
- Others
- Reinforced earthquake-resistant structure
(3 berths)
* Two berths are already in service.
Tobishima Pier East Side Container Terminal
- Water depth
- 15.0m
- Berth length
- 1,400m (4 berths)
- Others
- Reinforced earthquake-resistant structure
(2 berths)
* One berth on NCB CT is being deepened to 15.0m. When completed, 4 consecutive berths including 2 berths on adjacent Tobishima South CT will form a 1,400 m quay with a wawter depth of 15.0m.
Kinjo Pier Automobile Handling Base
- Water depth
- 12.0m
- Berth length
- 520m (2 Berths), 260m (1 Berth)
- Land reclamation
- 18.6 ha
- Others
- Reinforced earthquake-resistant structure
(1 berth)
Channel
Expansion and further deepening
- West channel
- 14.0m deep, 400-540m wide
- Central channel
- 14.0-16.0m deep, 400m wide