Tobishima Pier North CT
The terminal started operation in 1984.
Located at north Tobishima Pier, this is one of the two public container terminals of the Port of Nagoya.
Terminal Specification
- Berths
- W90, W91, W92
- Total length
- 620m
- Water depth
- 10-12m
- Yard capacity
- 2,862TEU (Ground Slots)
- Reefer yard
- 140TEU (Ground Slots) (The figure is included in the figure for Capacity.)
- Reefer outlets
- 110
- Gates
-
2lanes(Inward), 4lanes(Outward), 2truck scales(50tons)
3checking bridges - Gantry Cranes
- 3(48.0t x1, 49.1t x2)
Lessee
Nagoya Port Termial Corporation
Terminal Operators
ASAHI UNYU KAISHA, LTD., ISEWAN TERMINAL SERVICE CO., LTD., Kamigumi Co., Ltd., TOKAI KYOWA Co., Ltd., NIPPON EXPRESS CO., LTD., FUJITRANS CORPOPATION, MITSUI-SOKO Co., Ltd., Mitsubishi Logistics Corporation, MEIKO TRANS CO., LTD.
Main Routes
North America West Coast,Indonesia, Singapore, Indochina