Container Terminals

ページ番号1001389  更新日 2024年10月11日 印刷 

conteiner terminal map

Terminal Details

Terminal Details
 

Tobishima Pier North
CT

NCB CT

Tobishima Pier South
CT

 

TobishimaPier
South Side
CT

Nabeta Pier

CT

Total
Berth No. W90/91/92 R1/R2/R3 W93/94 TS1/TS2 T1/T2/T3 13 Berths
Berth Length (m) 620 900 700 750 985 3,955
Depth (m) 10-12 12-15 15 16 12-14 ---
Terminal Area (m²) 170,556 289,410 225,732 361,549 549,686 1,596,933
Gantry Crane 3 6 6 6 8 29
Throughput 2023
(TEU)
150,489 620,461 263,485 557,760 1,103,629 2,698,118

* The total container throughput includes the number of containers (in TEU) handled at non-container-designated terminals.

*Figures of the NCB Container Terminal may differ from the actual situation during quay reconstruction work.