Container Terminals
Terminal Details
Tobishima Pier North |
NCB CT |
Tobishima Pier South
|
TobishimaPier South Side CT |
Nabeta Pier CT |
Total | |
---|---|---|---|---|---|---|
Berth No. | W90/91/92 | R1/R2/R3 | W93/94 | TS1/TS2 | T1/T2/T3 | 13 Berths |
Berth Length (m) | 620 | 900 | 700 | 750 | 985 | 3,955 |
Depth (m) | 10-12 | 12-15 | 15 | 16 | 12-14 | --- |
Terminal Area (m²) | 170,556 | 289,410 | 225,732 | 361,549 | 549,686 | 1,596,933 |
Gantry Crane | 3 | 6 | 6 | 6 | 8 | 29 |
Throughput 2023 (TEU) |
150,489 | 620,461 | 263,485 | 557,760 | 1,103,629 | 2,698,118 |
* The total container throughput includes the number of containers (in TEU) handled at non-container-designated terminals.
*Figures of the NCB Container Terminal may differ from the actual situation during quay reconstruction work.